Turnkey modular skid engineering for marine fuel supply, valve control, and liquid process networks—delivering pre-commissioned, class-certified, plug-and-play skid packages for seamless shipyard installation.
YADA skid production line has an annual output of 350 sets of skids providing one-stop solutions from principle design, detailed design, production design, component manufacturing, pipeline prefabrication and skid integration to installation and commissioning, operation and maintenance services.
Improve R&D and production efficiency through professional design, standardized manufacturing process and experienced production team; Through professional quality controlsystem, inspection equipment and instruments to ensure product quality; Through pipeline prefabrication and skid integration, to reduce on-site installation time, so as to decrease management difficulty, reduce cost and increase efficiency for customers.
100t
350sets
Wärtsilä, CNOOC
and otherwel-known customersboth100%
Traceable Components
LP buffer unit
The LP buffer unit sets a LP buffer tank to receive fuel from the low pressure vaporization heater to ensure stable operation of the two generators.LP buffer unit
The LP buffer unit sets a LP buffer tank to receive fuel from the low pressure vaporization heater to ensure stable operation of the two generators.
BK unit(PS&SB)
The LNG BK unit is an independent system equipment module used to control and handle the filling of LNG fuel. It shall be installed in the LNG bunker station and mainly used to operate, monitor and alarm various matters in the filling process.BK unit(PS&SB)
The LNG BK unit is an independent system equipment module used to control and handle the filling of LNG fuel. It shall be installed in the LNG bunker station and mainly used to operate, monitor and alarm various matters in the filling process.
Reliquefaction unit
The LNG is subcooled to -172°C by exchanging heat with a plate-fin heat exchanger in the helium-nitrogen refrigeration cycle. The subcooled LNG is fed to the top of the LNG storage tank by cryogenic pumps, where it is exchanged with BOG through the top spray and part of the BOG is liquefied.Reliquefaction unit
The LNG is subcooled to -172°C by exchanging heat with a plate-fin heat exchanger in the helium-nitrogen refrigeration cycle. The subcooled LNG is fed to the top of the LNG storage tank by cryogenic pumps, where it is exchanged with BOG through the top spray and part of the BOG is liquefied.
Water/glycol unit
The water/glycol unit generally consists of circulation water pump, heat exchanger, expansion tank, piping system and various monitoring equipment. Using the direct heat source provided by the outside world, the water glycol solution can be heated...Water/glycol unit
The water/glycol unit generally consists of circulation water pump, heat exchanger, expansion tank, piping system and various monitoring equipment. Using the direct heat source provided by the outside world, the water glycol solution can be heated...
Tank Connection Space(TCS)
The unit consists of a TCS hatch room, internal gas supply piping, equipment, ventilation facilities, electrical facilities and other parts, and is equipped with air locks. It is mainly used in scenarios such as LNG tank refueling; fuel...Tank Connection Space(TCS)
The unit consists of a TCS hatch room, internal gas supply piping, equipment, ventilation facilities, electrical facilities and other parts, and is equipped with air locks. It is mainly used in scenarios such as LNG tank refueling; fuel...
Condenser unit
The condenser unit is a heat exchange device that cools down the high temperature and high pressure refrigerant vapors discharged from the compressor by dissipating the heat, and coagulates or condenses them to ensure the...Condenser unit
The condenser unit is a heat exchange device that cools down the high temperature and high pressure refrigerant vapors discharged from the compressor by dissipating the heat, and coagulates or condenses them to ensure the...
Reliquefaction unit
The reliquefaction unit mainly consists of reciprocating compressors and cargo compressors, which cool down the loaded cargo to keep it at a low temperature.Reliquefaction unit
The reliquefaction unit mainly consists of reciprocating compressors and cargo compressors, which cool down the loaded cargo to keep it at a low temperature.
Booster pump unit
The booster pump unit without on-site assembly, only need to complete the import and export piping connections, external electrical connections and a small amount of installation work, then can be used directly. The entire system covers...Booster pump unit
The booster pump unit without on-site assembly, only need to complete the import and export piping connections, external electrical connections and a small amount of installation work, then can be used directly. The entire system covers...
PROFESSIONAL DESIGN TEAM
A professional design team with 100 more engineers, specializing in structure, turbine, pipeline analysis, stress analysis, welding, machinery, automation, etc., can provide pipeline scheme design, modeling design, stress calculation, TDS submission and production design according to customer demand for skid products.
PERFECT WORKMANSHIP STANDARDS
Implement strict requirements and standardized operation guidelines for different functional skids from 100% traceable of each component to standardized key manufacture processes including assembly, welding, Non-Destructive Test, leakage test, final inspection and packaging.
PROFESSIONAL PRODUCT FABRICATION
Pipeline system all homemade, more than 20,000 square meters of skid assembly workshop, experienced production team and rigorous work procedures to ensure the skid product quality.
WHOLE PROCESS QUALITY CONTROL
Professional inspection team equipped with complete inspection equipment and testing instruments execute the whole process of skid quality control from quality planning,ITP review, final inspection application to data submission.
EXPERIENCED PROJECT MANAGEMENT TEAM
YADA has successively served 91,000m3 LPG carriers for Daewoo Heavy Industries, 178,000m' LNG carrier for lMAGl Shipbuilding, 174,000m3 LNG carriers for Hudong Zhonghua Shipbuilding, 119,000 tons of dual-fuel oil tankers for Guangzhou Shipbuilding International, and 14,000TEU dual-fuel container ships for New Yangzi, has accumulated rich project experience.
YADA has obtained relevant certifications and approvals from major international marine classification societies, supporting its piping products and engineering solutions for shipbuilding, marine engineering, offshore, LNG and petrochemical projects.
The classification societies recognized by YADA include Bureau Veritas (BV), China Classification Society (CCS), Russian Maritime Register of Shipping (RS), Korean Register (KR), ClassNK, American Bureau of Shipping (ABS), Lloyd's Register (LR), DNV and RINA.